Free Maine Electrical Permit Form in PDF Open Maine Electrical Permit Editor Now

Free Maine Electrical Permit Form in PDF

The Maine Electrical Permit form is a crucial document required for obtaining permission to perform electrical work within the state of Maine. This form is specifically designed for licensed electricians, ensuring that all installations comply with state regulations and safety standards. By completing and submitting this application, electricians take an important step in safeguarding both their work and the well-being of the public.

Open Maine Electrical Permit Editor Now
Table of Contents

The Maine Electrical Permit form is an essential document for anyone planning electrical work in the state. This application, overseen by the Department of Professional and Financial Regulation, is designed for licensed electricians who need to secure a permit for their projects. The form requires detailed information, including the electrician's name, license number, and contact details. It also specifies the worksite's location and the type of electrical work being performed. Various fee structures are outlined, depending on the nature of the work, such as the installation of electrical systems for residential or commercial properties. Notably, the minimum fee for obtaining a permit is $75, and all fees are non-refundable. Electricians must certify the accuracy of the information they provide and acknowledge their responsibility to comply with applicable laws and regulations. Additionally, payment options are available, including credit card payments, which streamline the process for applicants. The form is comprehensive, ensuring that all necessary details are captured to facilitate proper oversight and regulation of electrical installations in Maine.

Form Sample

ELECTRICAL PERMIT APPLICATION

STATE OF MAINE

DEPARTMENT OF PROFESSIONAL & FINANCIAL REGULATION OFFICE OF PROFESSIONAL & OCCUPATIONAL REGULATION

ELECTRICIANS’ EXAMINING BOARD

35 STATE HOUSE STATION

AUGUSTA, ME 04333

TEL: (207)624-8457 FAX: (207)624-8636 HEARING IMPAIRED: 1-888-577-6690 Location: 76 Northern Avenue, Gardiner, Maine

Office Use Only Check #: _______________

Amount: _______________

Cash #: ________________

Permit #: _______________

4220-1441

 

PERMIT FEES ARE NON-REFUNDABLE

 

 

MINIMUM FEE $75.00

 

 

 

 

 

 

 

ELECTRICIAN INFORMATION (PLEASE PRINT)

ONLY A LICENSED MASTER OR LIMITED ELECTRICIAN MAY OBTAIN AN ELECTRICAL PERMIT

Name

 

 

 

 

Mailing Address

 

 

 

 

City

 

State

Zip Code

Telephone

 

 

License #

 

By my signature, I hereby certify that the information provided on this application is true and accurate to the best of my knowledge and belief. By submitting this application, I understand that I am legally and professionally responsible for compliance with all laws and rules enforceable by the board with respect to the installation for which the permit is requested. Electricians’ Examining Board Rule 02-318 Chapter 135.

SIGNATURE OF ELECTRICIAN

DATE

PAYMENT OPTIONS

Make checks payable to “Maine State Treasurer” – if you wish to pay by Mastercard or Visa, fill out the following:

Name of cardholder (please print) FIRSTMIDDLE INITIAL LAST

I authorize the Department of Professional and Financial Regulation, Office of Professional & Occupational Regulation to

charge my

VISA

MASTERCARD the following amount: $_______________________

Card number: XXXX – XXXX – XXXX – XXXX

Expiration Date:

mm / yyyy

SIGNATURE

DATE

LOCATION OF BUILDING WORKSITE

 

Commercial/2-Family

Single family – temporary service only

Street/Road

 

 

 

Town/City

County

 

Landmarks (Be Specific)

 

 

 

 

 

 

 

OWNER

Name

 

 

 

Mailing Address

 

 

 

City

State

 

Zip Code

Telephone

 

 

 

(CONTINUE ON BACK)

SCOPE OF WORK

FEE SCHEDULE: - CHECK ONE:

PERMANENT

TEMPORARY

1 and 3 phase through 800 amperes

 

____ @ $75.00

$

1 and 3 phase 801 and larger

 

____ @ $85.00

$

Panels remote from the main service

 

____ @ $7.50

$

Recreational vehicle park sites

 

____ @ $7.50

$

Receptacles, switches, luminaries, electrical heating units, permanently

 

 

connected appliances and outside lighting and signs

 

____ @ $.50

$

Transformers – Not utility owned

 

____ @ $20.00

$

Motors and Generators:

 

 

 

Motors – fractional

 

____ @ $2.00

$

Motors – 1 hp and larger

 

____ @ $4.00

$

Generators (emergency, required standby, optional)

 

____ @ $30.00

$

Electrical Alarm Systems

 

____ @ $75.00

$

Energy Management Systems

 

____ @ $75.00

$

Alternative Energy Systems:

 

 

$

Photovoltaic

 

____ @ $75.00

 

Wind

 

____ @ $75.00

 

Micro-Hydro, Fuel Cell, Other

 

____ @ $75.00

 

Systems Control wiring (HVAC)

 

____ @ $75.00

$

TOTAL DUE ($75.00 MINIMUM FEE)

 

 

$

Document Overview

Fact Name Description
Governing Authority The Maine Electrical Permit form is governed by the Electricians’ Examining Board under Rule 02-318 Chapter 135.
Minimum Fee The minimum fee for an electrical permit is $75.00, which is non-refundable.
Eligibility Only licensed master or limited electricians are authorized to obtain an electrical permit in Maine.
Payment Methods Payments can be made via check payable to "Maine State Treasurer" or by credit card (Visa or Mastercard).
Contact Information The form includes contact details for the Department of Professional & Financial Regulation, including a phone number and fax number.
Scope of Work Applicants must specify the scope of work, including whether the service is permanent or temporary.
Owner Information The form requires the owner's name, address, and contact information to be provided.
Fee Schedule A detailed fee schedule is included, outlining costs for various types of electrical work, such as installations and systems.
Please rate Free Maine Electrical Permit Form in PDF Form
4.67
(Exceptional)
24 Votes

Fill out Other Templates